Work is ongoing at the Langenwang Austrian pilot, to prepare the installation of the HYBUILD hybrid storage system.
The continental climate system will be installed at this pilot site. The maximum heating power consumption expected after the foreseen retrofitting operations is 10 kW. The following technologies will be applied in the building: PV, PCM thermal latent storage, Heat pump.